Waste management on construction sitess
A study is carried out before starting any project to identify the type of waste generated by the renovation works. This study allows us to determine the type of container we will need.
The generated low-volume waste will be collected and sorted daily on site in waterproof rubble bags. The waste will be removed weekly.
Bulkier waste will be sorted and disposed of in appropriate dumpsters. We prefer storage or incineration among the different waste management methods, but we always try to find the most environmentally friendly solution.
Large volume waste (cardboard, film, etc.) is compressed and bound to reduce its size and reduce the risk of it flying away.
Waste likely to absorb water (paper, cardboard, mineral wools, vegetable insulation, etc.) is stored away from the rain to avoid excessive weight and deterioration that would prevent recycling.